<?xml version="1.0" encoding="UTF-8"?>
<article xmlns:xlink="http://www.w3.org/1999/xlink" xml:lang="en" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
  <front>
    <journal-meta>
      <journal-id journal-id-type="ojs">ISTAER</journal-id>
      <journal-title-group>
        <journal-title xml:lang="en">International Scientific Technical  and Economic Research</journal-title>
      </journal-title-group>
      <publisher>
        <publisher-name>Digital Intelligence Press</publisher-name>
        <publisher-loc>Hong Kong<country>HK</country><uri>https://dipscie.com/index.php/ISTAER/index</uri></publisher-loc>
      </publisher>
      <issn pub-type="epub">3136-0343</issn>
      <issn pub-type="ppub">2959-1309</issn>
      <self-uri xlink:href="https://dipscie.com/index.php/ISTAER"/>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="publisher-id">25</article-id>
      <article-categories>
        <subj-group xml:lang="en" subj-group-type="heading">
          <subject>Articles</subject>
        </subj-group>
      </article-categories>
      <title-group>
        <article-title xml:lang="en">The Role of Integrated Project Management Techniques in Enhancing Infrastructure Project Performance in the Greater Cairo Metro</article-title>
      </title-group>
      <contrib-group content-type="author">
        <contrib corresp="yes">
          <name-alternatives>
            <string-name specific-use="display">Hesham Sayed Seifelnaser Soliman</string-name>
            <name name-style="western" specific-use="primary">
              <surname>Soliman</surname>
              <given-names>Hesham Sayed Seifelnaser</given-names>
            </name>
          </name-alternatives>
          <email>heshamseifengineer91@gmail.com</email>
          <xref ref-type="aff" rid="aff-1"/>
        </contrib>
      </contrib-group>
      <aff id="aff-1">
        <institution content-type="orgname">Department of Project Management, Faculty of Graduate Studies for Statistical Research, Cairo University, Giza, Egypt</institution>
      </aff>
      <pub-date date-type="pub" publication-format="epub">
        <day>16</day>
        <month>10</month>
        <year>2026</year>
      </pub-date>
      <fpage>1</fpage>
      <lpage>44</lpage>
      <pub-history>
        <event event-type="received">
          <event-desc>Received: <date date-type="received" iso-8601-date="2026-08-12T18:26:48+00:00"><day>12</day><month>8</month><year>2026</year></date></event-desc>
        </event>
      </pub-history>
      <permissions>
        <copyright-statement>Copyright (c) 2026 Hesham Soliman (Author)</copyright-statement>
        <copyright-year>2026</copyright-year>
        <copyright-holder>Hesham Soliman (Author)</copyright-holder>
        <license xlink:href="https://creativecommons.org/licenses/by/4.0">
          <license-p>&lt;a rel="license" href="https://creativecommons.org/licenses/by/4.0/"&gt;&lt;img alt="Creative Commons License" src="//i.creativecommons.org/l/by/4.0/88x31.png" /&gt;&lt;/a&gt;&lt;p&gt;This work is licensed under a &lt;a rel="license" href="https://creativecommons.org/licenses/by/4.0/"&gt;Creative Commons Attribution 4.0 International License&lt;/a&gt;.&lt;/p&gt;</license-p>
        </license>
      </permissions>
      <self-uri xlink:href="https://dipscie.com/index.php/ISTAER/article/view/10.67541_istaer2628"/>
      <kwd-group xml:lang="en">
        <kwd>Earned Value Management; Six Sigma; Work Breakdown Structure; Program Evaluation and Review Technique; Infrastructure Rehabilitation</kwd>
      </kwd-group>
      <counts>
        <page-count count="44"/>
      </counts>
      <custom-meta-group/>
    </article-meta>
  </front>
  <body>
    <p>
    
    The Impact of Integrating Project Management Techniques on Improving the Performance of Infrastructure Projects: An Application to Greater Cairo Metro
    
    
    
        Hesham Sayed Seifelnaser Soliman1*
        
            
                
                
            
        
    
    
    
    
        1 Department of Project Management, Faculty of Graduate Studies for Statistical Research, Cairo University, Giza, Egypt
    
    
        * Corresponding author: Hesham Sayed Seifelnaser Soliman. Email: 12422023576587@pg.cu.edu.eg
    
    
    
    
        International Scientific Technical and Economic Research 2026, Vol. 4, No. 4, pp. 1-44
        DOI: 10.67541/istaer2628
        Received: 12 August 2026; Revised: 27 August 2026; Accepted: 19 September 2026; Published: 16 October 2026
    
    
    
    Abstract
    
        &lt;p&gt;Infrastructure projects frequently encounter challenges related to cost overruns, schedule delays, scope deviations, and quality deficiencies, particularly in complex rehabilitation projects operating under strict operational constraints. This paper investigates the Impact of Integrating Project Management Techniques on Improving the Performance of Infrastructure Projects, with an application to Greater Cairo Metro. A quantitative descriptive-analytical approach was adopted using data collected through a structured questionnaire from 242 valid respondents drawn from a population of 650 participants involved in the Fire Protection System Rehabilitation Project on Greater Cairo Metro Line 1. The data were analyzed using the Statistical Package for the Social Sciences (SPSS) 25 and Analysis of Moment Structures (AMOS) through reliability and validity tests, Confirmatory Factor Analysis (CFA), Structural Equation Modeling (SEM), and Path Analysis. The results revealed a statistically significant positive effect of integrating project management techniques on infrastructure project performance. The findings also demonstrated statistically significant positive effects for each of the four techniques investigated individually. Among the standardized path coefficients, Earned Value Management (EVM) had the numerically largest coefficient, followed by Program Evaluation and Review Technique (PERT), Six Sigma, and Work Breakdown Structure (WBS). The integrated application of these complementary techniques was associated with improvements in budget control, schedule adherence, scope adherence, and quality improvement. This study contributes by empirically examining both the overall integrated relationship and the individual relationships of EVM, WBS, PERT, and Six Sigma with infrastructure project performance within a real-world infrastructure rehabilitation project and provides practical guidance for improving the performance of similar projects operating under safety and operational constraints.&lt;/p&gt;
    
    
    
    Keywords
    
        Earned Value Management
        Six Sigma
        Work Breakdown Structure
        Program Evaluation and Review Technique
        Infrastructure Rehabilitation
    
    
    
    References
    
        
            Lukhele, T. M., Botha, B., &amp;amp; Mbanga, S. (2022). A conceptual framework for systematic project planning towards the successful delivery of infrastructure development projects in the public sector. Journal of Public Administration, 57(3). DOI: 10520/ejc-jpad-v57-n3-a9
            Fauzan, M., &amp;amp; Sunindijo, R. Y. (2021). Lean construction and project performance in the Australian construction industry. IOP Conference Series: Earth and Environmental Science, 907(1), 012024. DOI: 10.1088/1755-1315/907/1/012024
            Bushuiev, D., &amp;amp; Kozyr, B. (2020). Hybrid infrastructure project management methodologies. Innovative Technologies and Scientific Solutions for Industries, 1(11), 35–43. DOI: 10.30837/2522-9818.2020.11.035
            Gemino, A., Reich, B. H., &amp;amp; Serrador, P. M. (2021). Agile, traditional, and hybrid approaches to project success: Is hybrid a poor second choice? Project Management Journal, 52(2), 161–175. DOI: 10.1177/8756972820973082
            Chountalas, P. T., &amp;amp; Tepaskoualos, F. A. (2019). Selective integration of management systems: A case study in the construction industry. The TQM Journal, 31(1), 12–27. DOI: 10.1108/TQM-03-2018-0028
            McDermot, E., Agdas, D., Rodríguez Díaz, C. R., Rose, T., &amp;amp; Forcael, E. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. International Journal of Construction Management, 22(13), 2469–2483. DOI: 10.1080/15623599.2020.1797985
            Andrić, J. M., Mahamadu, A.-M., Wang, J., Zou, P. X. W., &amp;amp; Zhong, R. (2019). The cost performance and causes of overruns in infrastructure development projects in Asia. Journal of Civil Engineering and Management, 25(3), 203–214. DOI: 10.3846/jcem.2019.8646
            Love, P. E. D., Sing, M. C. P., Ika, L. A., &amp;amp; Newton, S. (2019). The cost performance of transportation projects: The fallacy of the Planning Fallacy account. Transportation Research Part A: Policy and Practice, 122, 1–20. DOI: 10.1016/j.tra.2019.02.004
            Khan, A., Waris, M., Panigrahi, S., Sajid, M. R., &amp;amp; Rana, F. (2021). Improving the performance of public sector infrastructure projects: Role of project governance and stakeholder management. Journal of Management in Engineering, 37(2). DOI: 10.1061/(asce)me.1943-5479.0000886
            Abbas, D. B. (2023). The use of (PERT and CPM) techniques to analyze a project network (An applied study on Al-Mustafa complex construction project in Al-Hartha District). The Gulf Economist, 57, 229–296.
            Vazquez, A., Pozzana, I., Kalogridis, G., &amp;amp; Ellinas, C. (2023). Activity networks determine project performance. Scientific Reports, 13, 509. DOI: 10.1038/s41598-022-27180-0
            Ismail, I., Khan, A., Waris, M., Haron, H., &amp;amp; Simamora, B. H. (2021). Exploring the role of project governance and stakeholder management in public sector infrastructure projects. International Journal of Organizational Business Excellence, 2(1), 1–10. DOI: 10.21512/ijobex.v2i1.7141
            Daoud, A. O., El Hefnawy, M., &amp;amp; Wefki, H. (2023). Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects. Alexandria Engineering Journal, 83, 326–334. DOI: 10.1016/j.aej.2023.10.052
            Gonçalves-Dosantos, J. C., García-Jurado, I., &amp;amp; Costa, J. (2020). Project Management: An R package for managing projects. The R Journal, 12(1), 419–436. DOI: 10.32614/rj-2020-009
            Ba'Its, H. A., Arum Puspita, I., &amp;amp; Bay, A. F. (2020). Combination of Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) for Project Schedule Development. International Journal of Integrated Engineering, 12(3), 68–75. DOI: uthm/ijie/4207
            Ou-Yang, C., &amp;amp; Chen, W.-L. (2019). A hybrid approach for project crashing optimization strategy with risk consideration: A case study for an EPC project. Mathematical Problems in Engineering, 2019, Article 9649632. DOI: 10.1155/2019/9649632
            Zohrehvandi, S. (2022). A project-scheduling and resource management heuristic algorithm in the construction of combined cycle power plant projects. Computers, 11(2), Article 23. DOI: 10.3390/computers11020023
            Taguedda, K., &amp;amp; Daoui, C. (2023). Contributions of network analysis to the effectiveness of project management: Case study of public works sector in Tamangasset. Journal of Strategy and Development, 13(2), 10–32. DOI: 10.34276/1822-013-002-001
            Aramali, V., Gibson, G. E., El Asmar, M., &amp;amp; Cho, N. (2021). Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS. Journal of Management in Engineering, 37(4), Article 0000925. DOI: 10.1061/(ASCE)ME.1943-5479.0000925
            Nizam, A., &amp;amp; Elshennawy, A. (2019). Review of earned value management (EVM) methodology, its limitations, and applicable extensions. Journal of Management &amp;amp; Engineering Integration, 12(1), 59–70. DOI: 10.62704/10057/24251
            Song, J., Martens, A., &amp;amp; Vanhoucke, M. (2022). Using earned value management and schedule risk analysis with resource constraints for project control. European Journal of Operational Research, 297(2), 451–466. DOI: 10.1016/j.ejor.2021.05.036
            Elghandour, A., Eid, A. F., &amp;amp; El Daly, H. (2021). Improving performance of construction projects by integrating risk into earned value management: A literature review. Journal of Al-Azhar University Engineering Sector, 16(60), 833–850. DOI: 10.21608/auej.2021.187983
            Abu El-Maaty, A. E., Akal, A. Y., &amp;amp; El-Hamrawy, S. A. K. (2018). The iron triangle of projects management: Quality, schedule and cost of road infrastructure projects in Egypt. In J. Calautit, F. M. S. Al-Zubaidi, A. A. Alshawa, &amp;amp; A. A. Al-Atabi (Eds.), Towards Sustainable Cities in Asia and the Middle East (Sustainable Civil Infrastructures, pp. 1–14). Springer. DOI: 10.1007/978-3-319-61645-2_1
            Johari, N. F., Zainal, R., Kasim, N., &amp;amp; Musa, S. M. S. (2024). The study of Six Sigma practices in construction project management performance. Research in Management of Technology and Business, 5(1), 1179–1205. DOI: uthm/rmtb/15968
            Makibelo, P., Makhanya, B., &amp;amp; Nel, H. (2021). Implementation of Six Sigma as quality improvement in a South African municipality. In Proceedings of the International Conference on Industrial Engineering and Operations Management (Monterrey, Mexico, November 3–5, 2021, pp. 1426–1438). IEOM Society International. DOI: ieomsociety/2021monterrey/229
            Shumali, S. I., &amp;amp; Nassar, A. J. (2021). The impact of implementing project management knowledge areas on public project quality in Palestine. Noor Economic Studies Journal, 6(2), 1–21. DOI: asjp.cerist.dz/151826
            Kaufmann, C., &amp;amp; Kock, A. (2022). Does project management matter? The relationship between project management effort, complexity, and profitability. International Journal of Project Management, 40(6), 624–633. DOI: 10.1016/j.ijproman.2022.05.007
            Al Amoudi, G. M., Hassan, A. F. A. H. M., &amp;amp; Jarad, F. A. (2024). The role of international standards for project management in increasing project quality in application to international partnerships in the kingdom of Saudi Arabia. International Journal of Financial, Administrative and Economic Sciences, 3(9). DOI: 10.59992/IJFAES.2024.v3n9p1
            Kebede Legesse, A., Abera, B., &amp;amp; Mekonnin, A. (2024). Effects of project management practices on the performance of Ethiopian National Stadium. Ethiopian Journal of Sport Science, 5(1), 19–42. DOI: 10.5281/zenodo.14531811
            Albtoush, A. M. F., Doh, S. I., Rahman, R. A., &amp;amp; Al-Momani, A. H. (2022). Critical success factors of construction projects in Jordan: An empirical investigation. Asian Journal of Civil Engineering, 23, 1087–1099. DOI: 10.1007/s42107-022-00470-8
            Sweis, R. J., &amp;amp; Jaradat, M. (2022). Project management performance of construction projects in Jordan: A comparative study of ISO 9001-certified and non-certified companies. The TQM Journal, 34(5), 1341–1364. DOI: 10.1108/TQM-02-2021-0060
            Safapour, E., &amp;amp; Kermanshachi, S. (2022). Key components in schedule development of post-disaster reconstruction projects. In Construction Research Congress 2022 (pp. 48–56). American Society of Civil Engineers. DOI: 10.1061/9780784483954.006
            Ateş, B., &amp;amp; Eirgash, M. A. (2025). Proactive and data-driven decision-making using earned value analysis in infrastructure projects. Buildings, 15(14), 2388. DOI: 10.3390/buildings15142388
            Kline, R. B. (2011). Principles and practice of structural equation modeling (3rd ed.). Guilford Press. DOI: 10.1002/0470013192.bsa655
            Hair, J. F., Hult, G. T. M., Ringle, C. M., &amp;amp; Sarstedt, M. (2014). A primer on partial least squares structural equation modeling (PLS-SEM). Springer. DOI: 10.1080/1743727X.2015.1005806
            Thompson, S. K. (2012). Sampling (3rd ed.). Wiley.
            Joshi, A., Kale, S., Chandel, S., &amp;amp; Pal, D. K. (2015). Likert scale: Explored and explained. British Journal of Applied Science &amp;amp; Technology, 7(4), 396–403. DOI: 10.9734/BJAST/2015/14975
            Hair, J. F., Anderson, R. E., Tatham, R. L., &amp;amp; Black, W. C. (1998). Multivariate data analysis (5th ed.). Prentice Hall.
            Byrne, B. M. (2001). Structural equation modeling with AMOS: Basic concepts, applications, and programming. Lawrence Erlbaum Associates Publishers. DOI: 10.4324/9780203805534
            El-Sheikh, A. A., Abonazel, M. R., &amp;amp; Gamil, N. (2017). A review of software packages for structural equation modeling: A comparative study. Applied Mathematics and Physics, 5(3), 85–94. DOI: 10.12691/amp-5-3-2
        
    
    
    
    
        &lt;p&gt;© 2026 The Author(s). Published by Digital Intelligence Press Limited. This is an open access article under the CC BY 4.0 license.&lt;/p&gt;
        &lt;p&gt;How to cite: Soliman, H. S. S. (2026). The Impact of Integrating Project Management Techniques on Improving the Performance of Infrastructure Projects: An Application to Greater Cairo Metro. International Scientific Technical and Economic Research, 4(4), 1-44. https://doi.org/10.67541/ISTAER2628&lt;/p&gt;
    
</p>
  </body>
  <back>
    <ref-list>
      <ref id="R1">
        <mixed-citation>[1] Lukhele, T. M., Botha, B., &amp; Mbanga, S. (2022). A conceptual framework for systematic project planning towards the successful delivery of infrastructure development projects in the public sector. Journal of Public Administration, 57(3). https://hdl.handle.net/10520/ejc-jpad-v57-n3-a9</mixed-citation>
      </ref>
      <ref id="R2">
        <mixed-citation>[2] Fauzan, M., &amp; Sunindijo, R. Y. (2021). Lean construction and project performance in the Australian construction industry. IOP Conference Series: Earth and Environmental Science, 907(1), 012024. https://doi.org/10.1088/1755-1315/907/1/012024</mixed-citation>
      </ref>
      <ref id="R3">
        <mixed-citation>[3] Bushuiev, D., &amp; Kozyr, B. (2020). Hybrid infrastructure project management methodologies. Innovative Technologies and Scientific Solutions for Industries, 1(11), 35–43. https://doi.org/10.30837/2522-9818.2020.11.035</mixed-citation>
      </ref>
      <ref id="R4">
        <mixed-citation>[4] Gemino, A., Reich, B. H., &amp; Serrador, P. M. (2021). Agile, traditional, and hybrid approaches to project success: Is hybrid a poor second choice? Project Management Journal, 52(2), 161–175. https://doi.org/10.1177/8756972820973082</mixed-citation>
      </ref>
      <ref id="R5">
        <mixed-citation>[5] Chountalas, P. T., &amp; Tepaskoualos, F. A. (2019). Selective integration of management systems: A case study in the construction industry. The TQM Journal, 31(1), 12–27. https://doi.org/10.1108/TQM-03-2018-0028</mixed-citation>
      </ref>
      <ref id="R6">
        <mixed-citation>[6] McDermot, E., Agdas, D., Rodríguez Díaz, C. R., Rose, T., &amp; Forcael, E. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. International Journal of Construction Management, 22(13), 2469–2483. https://doi.org/10.1080/15623599.2020.1797985</mixed-citation>
      </ref>
      <ref id="R7">
        <mixed-citation>[7] Andrić, J. M., Mahamadu, A.-M., Wang, J., Zou, P. X. W., &amp; Zhong, R. (2019). The cost performance and causes of overruns in infrastructure development projects in Asia. Journal of Civil Engineering and Management, 25(3), 203–214. https://doi.org/10.3846/jcem.2019.8646</mixed-citation>
      </ref>
      <ref id="R8">
        <mixed-citation>[8] Love, P. E. D., Sing, M. C. P., Ika, L. A., &amp; Newton, S. (2019). The cost performance of transportation projects: The fallacy of the Planning Fallacy account. Transportation Research Part A: Policy and Practice, 122, 1–20. https://doi.org/10.1016/j.tra.2019.02.004</mixed-citation>
      </ref>
      <ref id="R9">
        <mixed-citation>[9] Khan, A., Waris, M., Panigrahi, S., Sajid, M. R., &amp; Rana, F. (2021). Improving the performance of public sector infrastructure projects: Role of project governance and stakeholder management. Journal of Management in Engineering, 37(2). https://doi.org/10.1061/(asce)me.1943-5479.0000886</mixed-citation>
      </ref>
      <ref id="R10">
        <mixed-citation>[10] Abbas, D. B. (2023). The use of (PERT and CPM) techniques to analyze a project network (An applied study on Al-Mustafa complex construction project in Al-Hartha District). The Gulf Economist, 57, 229–296.</mixed-citation>
      </ref>
      <ref id="R11">
        <mixed-citation>[11] Vazquez, A., Pozzana, I., Kalogridis, G., &amp; Ellinas, C. (2023). Activity networks determine project performance. Scientific Reports, 13, 509. https://doi.org/10.1038/s41598-022-27180-0</mixed-citation>
      </ref>
      <ref id="R12">
        <mixed-citation>[12] Ismail, I., Khan, A., Waris, M., Haron, H., &amp; Simamora, B. H. (2021). Exploring the role of project governance and stakeholder management in public sector infrastructure projects. International Journal of Organizational Business Excellence, 2(1), 1–10. https://doi.org/10.21512/ijobex.v2i1.7141</mixed-citation>
      </ref>
      <ref id="R13">
        <mixed-citation>[13] Daoud, A. O., El Hefnawy, M., &amp; Wefki, H. (2023). Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects. Alexandria Engineering Journal, 83, 326–334. https://doi.org/10.1016/j.aej.2023.10.052</mixed-citation>
      </ref>
      <ref id="R14">
        <mixed-citation>[14] Gonçalves-Dosantos, J. C., García-Jurado, I., &amp; Costa, J. (2020). Project Management: An R package for managing projects. The R Journal, 12(1), 419–436. https://doi.org/10.32614/rj-2020-009</mixed-citation>
      </ref>
      <ref id="R15">
        <mixed-citation>[15] Ba'Its, H. A., Arum Puspita, I., &amp; Bay, A. F. (2020). Combination of Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) for Project Schedule Development. International Journal of Integrated Engineering, 12(3), 68–75. https://journal.uthm.edu.my/index.php/ijie/article/view/4207</mixed-citation>
      </ref>
      <ref id="R16">
        <mixed-citation>[16] Ou-Yang, C., &amp; Chen, W.-L. (2019). A hybrid approach for project crashing optimization strategy with risk consideration: A case study for an EPC project. Mathematical Problems in Engineering, 2019, Article 9649632. https://doi.org/10.1155/2019/9649632</mixed-citation>
      </ref>
      <ref id="R17">
        <mixed-citation>[17] Zohrehvandi, S. (2022). A project-scheduling and resource management heuristic algorithm in the construction of combined cycle power plant projects. Computers, 11(2), Article 23. https://doi.org/10.3390/computers11020023</mixed-citation>
      </ref>
      <ref id="R18">
        <mixed-citation>[18] Taguedda, K., &amp; Daoui, C. (2023). Contributions of network analysis to the effectiveness of project management: Case study of public works sector in Tamangasset. Journal of Strategy and Development, 13(2), 10–32. https://doi.org/10.34276/1822-013-002-001</mixed-citation>
      </ref>
      <ref id="R19">
        <mixed-citation>[19] Aramali, V., Gibson, G. E., El Asmar, M., &amp; Cho, N. (2021). Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS. Journal of Management in Engineering, 37(4), Article 0000925. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000925</mixed-citation>
      </ref>
      <ref id="R20">
        <mixed-citation>[20] Nizam, A., &amp; Elshennawy, A. (2019). Review of earned value management (EVM) methodology, its limitations, and applicable extensions. Journal of Management &amp; Engineering Integration, 12(1), 59–70. https://doi.org/10.62704/10057/24251</mixed-citation>
      </ref>
      <ref id="R21">
        <mixed-citation>[21] Song, J., Martens, A., &amp; Vanhoucke, M. (2022). Using earned value management and schedule risk analysis with resource constraints for project control. European Journal of Operational Research, 297(2), 451–466. https://doi.org/10.1016/j.ejor.2021.05.036</mixed-citation>
      </ref>
      <ref id="R22">
        <mixed-citation>[22] Elghandour, A., Eid, A. F., &amp; El Daly, H. (2021). Improving performance of construction projects by integrating risk into earned value management: A literature review. Journal of Al-Azhar University Engineering Sector, 16(60), 833–850. https://doi.org/10.21608/auej.2021.187983</mixed-citation>
      </ref>
      <ref id="R23">
        <mixed-citation>[23] Abu El-Maaty, A. E., Akal, A. Y., &amp; El-Hamrawy, S. A. K. (2018). The iron triangle of projects management: Quality, schedule and cost of road infrastructure projects in Egypt. In J. Calautit, F. M. S. Al-Zubaidi, A. A. Alshawa, &amp; A. A. Al-Atabi (Eds.), Towards sustainable cities in Asia and the Middle East (Sustainable Civil Infrastructures, pp. 1–14). Springer. https://doi.org/10.1007/978-3-319-61645-2_1</mixed-citation>
      </ref>
      <ref id="R24">
        <mixed-citation>[24] Johari, N. F., Zainal, R., Kasim, N., &amp; Musa, S. M. S. (2024). The study of Six Sigma practices in construction project management performance. Research in Management of Technology and Business, 5(1), 1179–1205. Retrieved August 25, 2026, from https://publisher.uthm.edu.my/periodicals/index.php/rmtb/article/view/15968</mixed-citation>
      </ref>
      <ref id="R25">
        <mixed-citation>[25] Makibelo, P., Makhanya, B., &amp; Nel, H. (2021). Implementation of Six Sigma as quality improvement in a South African municipality. In Proceedings of the International Conference on Industrial Engineering and Operations Management (Monterrey, Mexico, November 3–5, 2021, pp. 1426–1438). IEOM Society International. Retrieved August 25, 2026, from https://ieomsociety.org/proceedings/2021monterrey/229.pdf</mixed-citation>
      </ref>
      <ref id="R26">
        <mixed-citation>[26] Shumali, S. I., &amp; Nassar, A. J. (2021). The impact of implementing project management knowledge areas on public project quality in Palestine. Noor Economic Studies Journal, 6(2), 1–21. https://asjp.cerist.dz/en/article/151826</mixed-citation>
      </ref>
      <ref id="R27">
        <mixed-citation>[27] Kaufmann, C., &amp; Kock, A. (2022). Does project management matter? The relationship between project management effort, complexity, and profitability. International Journal of Project Management, 40(6), 624–633. https://doi.org/10.1016/j.ijproman.2022.05.007</mixed-citation>
      </ref>
      <ref id="R28">
        <mixed-citation>[28] Al Amoudi, G. M., Hassan, A. F. A. H. M., &amp; Jarad, F. A. (2024). The role of international standards for project management in increasing project quality in application to international partnerships in the kingdom of Saudi Arabia. International Journal of Financial, Administrative and Economic Sciences, 3(9). https://doi.org/10.59992/IJFAES.2024.v3n9p1</mixed-citation>
      </ref>
      <ref id="R29">
        <mixed-citation>[29] Kebede Legesse, A., Abera, B., &amp; Mekonnin, A. (2024). Effects of project management practices on the performance of Ethiopian National Stadium. Ethiopian Journal of Sport Science, 5(1), 19–42. https://doi.org/10.5281/zenodo.14531811</mixed-citation>
      </ref>
      <ref id="R30">
        <mixed-citation>[30] Albtoush, A. M. F., Doh, S. I., Rahman, R. A., &amp; Al-Momani, A. H. (2022). Critical success factors of construction projects in Jordan: An empirical investigation. Asian Journal of Civil Engineering, 23, 1087–1099. https://doi.org/10.1007/s42107-022-00470-8</mixed-citation>
      </ref>
      <ref id="R31">
        <mixed-citation>[31] Sweis, R. J., &amp; Jaradat, M. (2022). Project management performance of construction projects in Jordan: A comparative study of ISO 9001-certified and non-certified companies. The TQM Journal, 34(5), 1341–1364. https://doi.org/10.1108/TQM-02-2021-0060</mixed-citation>
      </ref>
      <ref id="R32">
        <mixed-citation>[32] Safapour, E., &amp; Kermanshachi, S. (2022). Key components in schedule development of post-disaster reconstruction projects. In Construction Research Congress 2022 (pp. 48–56). American Society of Civil Engineers. https://doi.org/10.1061/9780784483954.006</mixed-citation>
      </ref>
      <ref id="R33">
        <mixed-citation>[33] Ateş, B., &amp; Eirgash, M. A. (2025). Proactive and data-driven decision-making using earned value analysis in infrastructure projects. Buildings, 15(14), 2388. https://doi.org/10.3390/buildings15142388</mixed-citation>
      </ref>
      <ref id="R34">
        <mixed-citation>[34] Kline, R. B. (2011). Principles and practice of structural equation modeling (3rd ed.). Guilford Press. 10.1002/0470013192.bsa655</mixed-citation>
      </ref>
      <ref id="R35">
        <mixed-citation>[35] Hair, J. F., Hult, G. T. M., Ringle, C. M., &amp; Sarstedt, M. (2014). A primer on partial least squares structural equation modeling (PLS-SEM). Springer. https://doi.org/10.1080/1743727X.2015.1005806</mixed-citation>
      </ref>
      <ref id="R36">
        <mixed-citation>[36] Thompson, S. K. (2012). Sampling (3rd ed.). Wiley.</mixed-citation>
      </ref>
      <ref id="R37">
        <mixed-citation>[37] Joshi, A., Kale, S., Chandel, S., &amp; Pal, D. K. (2015). Likert scale: Explored and explained. British Journal of Applied Science &amp; Technology, 7(4), 396–403. https://doi.org/10.9734/BJAST/2015/14975</mixed-citation>
      </ref>
      <ref id="R38">
        <mixed-citation>[38] Hair, J. F., Anderson, R. E., Tatham, R. L., &amp; Black, W. C. (1998). Multivariate data analysis (5th ed.). Prentice Hall.</mixed-citation>
      </ref>
      <ref id="R39">
        <mixed-citation>[39] Byrne, B. M. (2001). Structural equation modeling with AMOS: Basic concepts, applications, and programming. Lawrence Erlbaum Associates Publishers. https://doi.org/10.4324/9780203805534</mixed-citation>
      </ref>
      <ref id="R40">
        <mixed-citation>[40] El-Sheikh, A. A., Abonazel, M. R., &amp; Gamil, N. (2017). A review of software packages for structural equation modeling: A comparative study. Applied Mathematics and Physics, 5(3), 85–94. https://doi.org/10.12691/amp-5-3-2</mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>
